Product Description
The ARC CO2 6000L is a high-capacity carbon dioxide removal system designed for confined environments with limited fresh air supply and potential CO2 accumulation. Developed for applications in civil defence shelters, bunkers and critical infrastructures, this system ensures the maintenance of safe and breathable conditions during extended periods of isolation.
With a modular architecture, the system allows multiple filtration configurations (1:1, 2:1, 3:1), adapting to the specific requirements of each installation and the number of occupants. Its high air processing capacity, combined with a manual backup operation option, ensures continuous functionality even in power failure scenarios, making it a robust solution for emergency and preparedness contexts.


Technical Specifications
Main Unit
System type: Modular CO2 scrubber
Function: CO2 removal and air regeneration
Applications: Shelters, bunkers, technical rooms, civil protection
Performance
Airflow range: 190 / 230 / 250 m³/h
Configuration: Modular (1:1, 2:1, 3:1)
Scalability: Adaptable to occupancy and space volume
Power Supply
AC: 230 / 115 V
Phase: Single-phase
Frequency: 50 / 60 Hz
Operation
Manual backup: Yes
Operating mode: Continuous operation with capability to function during power outages
Components
Blower unit
Modular CO2 filtration system
Air connections (inlet/outlet)
Control system
Modular support structure
Operational Context
This type of system is critical in infrastructures where external air renewal is not possible or must be avoided. In isolation scenarios, the increase in CO2 concentration is one of the main limiting factors for safe occupancy. The ARC CO2 6000L mitigates this risk, ensuring greater autonomy and control of the internal environment.
Total estimated delivery time
After confirming your order on Portugal Bunkers & Shelters, you will receive a confirmation email with all product information, prices and taxes.
After we submit your request, you will receive an email again confirming that your order has been sent.
The total time required to receive an order is as follows:

Total shipping time is calculated from the time your order is placed to the time it is shipped. Total delivery time is divided into processing time and shipping time.
Processing Time: The time required to analyse your order and prepare the products for shipment from our warehouse. This includes, in some cases, the production or customisation of products.
Packaging time: The time required to package the products. This includes the quality control checks when products were customised.
Delivery Time: The time it takes for the product to ship from our warehouse to your shipping address.
Delivery time may be conditioned by the address you enter in your purchase.
If you require further information, please contact our customer service.
We would be happy to support you with your purchase.